EZ-Fit Internal High Level Balanced Flues (White System)

Grant EZ-Fit White System - High Level - blackHigh level balanced flue kits feature the same EZ-Fit boiler connections as the low level flue. The unique clamping system on the high level flue ensures easy assembly thereby reducing installation costs.

The kits may be extended horizontally and vertically. It is now possible to create offsets in standard high level flue systems by using our 45º elbows and extension kits – increasing the versatility of this new range.

The high level kits feature self sealing exhaust ducts and a quick-fit locking band connection for the air duct, which vastly reduces the time taken to complete the installation.

Features

  • Suitable for Grant Vortex boilers up to 70kW
  • Maximum total flue length = 10 metres (deduct 1 metre for each additional 45° elbow used)
  • Flue may be extended horizontally and vertically
  • Unique connection system ensures easy assembly
  • Extensions available in 225mm, 450mm or 950mm fixed lengths and a 275-450mm adjustable length
  • Supplied as a complete kit
  • 150mm flue pipe diameter for boilers up to 26kW
  • 180mm flue diameter for boilers from 26-70kW
  • Terminal guard (not supplied) required when the flue terminates less than 2 metres
  • Possible to create offsets in straight flue runs by using our 45° elbows and extensions

Case Studies

Out with the old and in with a new Grant Vortex

A three storey property in Argyll has recently upgraded its heating system with a Grant Vortex oil-fired boiler which is working alongside a Grant energy management control system, providing warmth throughout the building. Vortex oil-fired boilers are renowned for their efficiency, but the effect of energy management controls can sometimesRead More

Living with a Grant Vecta biomass boiler

Grant UK visited Mike and Sarah Hodgson who recently had a Vecta wood pellet boiler installed at their property, to discuss why they chose this renewable technology and to uncover a homeowner’s perspective of living with biomass. At the beginning of 2017, Mike and Sarah Hodgson had an internal VectaRead More

East Green Energy lead the way with Grant Spira

Renewable energy specialists East Green Energy are leading the way by installing an award wining Grant Spira Wood Pellet Boiler in their showroom at the Company’s Suffolk headquarters. Believed to be the only showroom in East Anglia with a fully working Wood Pellet Boiler, it is certainly generating a greatRead More

Local Authority upgrades sheltered housing with Grant

Sheltered housing schemes in Archway Gardens and Willow Road featuring renewable products from Grant UK, have been instrumental in helping Stroud District Council (which won the prestigious 2010 Green Energy Award for being the South West’s most proactive Local Authority), with its green housing energy initiative. The award recognises theRead More