Vortex Combi upgrade saves installers time and money

Grant Vortex Pro 2014 Internal Combi SE Pump (Internal View)

Following valuable feedback from G-One installers and the training academy, Grant UK has made some innovative upgrades to the Combi models within its successful Vortex range.

Most oil-fired combination boilers are supplied with a 12 litre expansion vessel and it’s the installer’s responsibility to provide any additional expansion for the system. The Vortex Combi range now includes a 24 litre expansion vessel, as well as fitting a plug and socket connection for the Riello RDB burner, as standard.

Therefore this upgrade to the Vortex Combi models will ultimately reduce extra installation time and cost, as in most cases a 24 litre vessel should more than cope with expansion for both the boiler and heating system and remove the need for an additional external vessel.

The plug and socket has been requested by service engineers to aid the removal of the burner during annual maintenance, making the job both quicker and easier. The latest Grant Vortex Combi models also feature internal frost protection, neon diagnostic indicators and a factory fitted internal condensate trap (this can be sited externally if preferred), all designed to make installation and servicing easier.

The large heat exchangers with their low water content and bigger surface area, vastly increase the hot water performance available, and the mixing valves are pre-set at 50°C, controlling accurately the hot water draw off temperature from the boiler. They have a low system pressure cut-off switch, enabling the Combi to protect itself in the unlikely event of system water loss. Additionally, there are two very accurate electronic temperature controls which allow the boiler to operate in condensing mode on central heating, whilst maintaining its instant hot water production.

The Vortex Combi is available in an internal or external version in three sizes – 21kW, 26kW and 36kW.

Grant releases timeline video of Company’s history

To mark nearly four decades of being involved in the heating industry, Grant Engineering have released a video timeline which follows the Company’s history and product innovations over the past forty years. This video, which was unveiled at the ISH exhibition in Frankfurt at the beginning of March, showcases theRead More

Grant UK welcomes new Sales Manager to the team

Grant UK is pleased to introduce their new Area Sales Manager in the South East, Alan Brooke, who has recently joined the Company. Alan will be the main contact at Grant UK for installers, merchants and homeowners in Hampshire, Surrey, West Sussex, East Sussex, South London, Kent and the IsleRead More

Grant makes successful debut at ISH

Earlier this month, Grant Engineering went to Frankfurt where they had a stand at ISH, one of the world’s largest trade exhibitions for water and energy technologies. Taking place on 14th – 18th March, ISH 2017 welcomed 2,482 exhibitors who shared their new product innovations in the water and energyRead More

Changes to Domestic RHI Scheme in Spring 2017

In December last year, the Department for Business, Energy and Industrial Strategy released details regarding proposed changes to the Domestic RHI Scheme which, subject to Parliamentary approval, will come into effect in Spring 2017. Earlier in 2016, a consultation was led by the Government to discuss necessary changes to theRead More

Changes to the RHI Scheme: Spring 2016

At the beginning of March 2016, the Department of Energy and Climate Change announced a number of changes to the Renewable Heat Incentive which are planned to come into force on 24th March 2016. Six key amendments are due to be introduced but further changes could also be announced. AsRead More